Updates
Free Citizen Tool

Electricity Bill Calculator

Work out your light bill for PGVCL, UGVCL, MGVCL, DGVCL and Torrent Power with the latest GERC slab rates – home, BPL and shop connections.

The four state companies have the same tariff.
Printed on your bill as "Load" / "Sanctioned load".
Current reading − previous reading, for the whole billing period.
Fuel surcharge changes every quarter; copy the rate from your bill.
Applied here on energy charge + FPPAS.
Estimated bill₹0
Energy + fixed charge₹0as per GERC tariff
Average per unit₹0

Advertisement

How is the electricity bill worked out in Gujarat?

The light bill of a home in Gujarat has four parts. The first two come from the tariff fixed by the Gujarat Electricity Regulatory Commission (GERC); the last two are added on top:

  1. Energy charge – the units you used, charged slab by slab (the first units are cheapest).
  2. Fixed charge – a small monthly amount that depends on your connected load (or single / three phase for Torrent Power).
  3. FPPAS (Fuel and Power Purchase Adjustment Surcharge) – a per-unit charge worked out by a GERC-approved formula. It changes from time to time, so it is not in the tariff schedule.
  4. Electricity duty – a government levy under the Gujarat Electricity Duty Act. The GERC tariff is exclusive of it.

This calculator works out parts 1 and 2 exactly from the GERC schedule. For the full amount, copy the FPPAS rate and the duty percentage from your latest bill into the optional boxes.

Residential tariff – PGVCL, UGVCL, MGVCL, DGVCL (from 1 April 2026)

The four state companies (Paschim, Uttar, Madhya and Dakshin Gujarat Vij Company) have one common tariff. Rates are per month; on a two-month bill each slab is doubled (first 100 units, next 100 units and so on).

Units per monthRGP (city)RGP Rural (gram panchayat)
First 50 units₹3.05₹2.65
Next 50 units (51–100)₹3.50₹3.10
Next 150 units (101–250)₹4.15₹3.75
Above 250 units₹5.20₹4.90

Smart pre-paid meter rates are a little lower: ₹2.96 / ₹3.40 / ₹4.03 / ₹5.04 (city) and ₹2.57 / ₹3.01 / ₹3.64 / ₹4.75 (rural). With a smart meter, units used between 11 AM and 5 PM get a discount of 60 paise per unit.

Connected loadFixed charge per month
Up to 2 kW₹15
Above 2 kW to 4 kW₹25
Above 4 kW to 6 kW₹45
Above 6 kW₹70
BPL household₹5

Torrent Power tariff – Ahmedabad, Gandhinagar and Surat

Residential (RGP)Ahmedabad–Gandhinagar
from 1 April 2026
Surat
schedule of 1 June 2024
First 50 units₹3.20₹3.20
51–100 units₹3.95₹3.65
101–200 units₹3.95₹4.25
201–250 units₹5.00₹4.25
Above 250 units₹5.00₹5.05
Fixed charge – single phase₹25 / month₹25 / month
Fixed charge – three phase₹65 / month₹65 / month

For Ahmedabad–Gandhinagar the slabs are: first 50 units, next 150 units, and the rest. The Surat figures are from the GERC schedule effective 1 June 2024, the latest Surat schedule we could open on the GERC website.

BPL households

A family with a BPL card pays only ₹1.50 per unit for the first 50 units a month (₹1.46 on a smart pre-paid meter of the state companies) and a fixed charge of ₹5 a month. Units above 50 are charged at the normal residential slabs. To get this rate, give a copy of the BPL card at the sub-division office (state companies) or zonal office (Torrent Power).

Commercial connections (Non-RGP)

CompanyFixed chargeEnergy charge
PGVCL / UGVCL / MGVCL / DGVCL
load up to 40 kW
₹50 per kW for the first 10 kW, ₹85 per kW for the next 30 kW₹4.35 (load up to 10 kW)
₹4.65 (above 10 kW)
Torrent – Ahmedabad–Gandhinagar
load up to 15 kW
₹70 per kW (load up to 5 kW), ₹90 per kW (5–15 kW)₹4.60 flat
Torrent – Surat
load up to 15 kW
₹70 per kW for the first 10 kW, ₹90 per kW for the next 5 kW₹4.35 (up to 10 kW)
₹4.55 (10–15 kW)

Worked example

A city home on PGVCL with a 2 kW load uses 300 units in a two-month bill. On a two-month bill the slabs double, so:

  • First 100 units × ₹3.05 = ₹305.00
  • Next 100 units × ₹3.50 = ₹350.00
  • Remaining 100 units × ₹4.15 = ₹415.00
  • Fixed charge ₹15 × 2 months = ₹30.00

Energy and fixed charge together come to ₹1,100. FPPAS and electricity duty from the bill are then added on top.

Tips to bring the bill down

  • Keep your use under the next slab: on a two-month bill of the state companies, units above 500 cost ₹5.20 each, against ₹3.05 for the first 100.
  • If you have a smart meter, run the washing machine, water pump or geyser between 11 AM and 5 PM for the 60 paise discount.
  • Check that the connected load on the bill is right – a higher load means a higher fixed charge.
  • Rooftop solar can cut most of the bill; see our solar subsidy calculator.

Frequently asked questions

What is the per unit electricity rate in Gujarat in 2026?

For homes on PGVCL, UGVCL, MGVCL and DGVCL the GERC rate from 1 April 2026 is ₹3.05 for the first 50 units a month, ₹3.50 for the next 50, ₹4.15 for the next 150 and ₹5.20 above 250 units (city). Village (gram panchayat) homes pay ₹2.65, ₹3.10, ₹3.75 and ₹4.90. FPPAS and electricity duty are extra.

Why is my bill higher than the slab rates?

The bill also has a fixed charge, the FPPAS fuel surcharge (charged on every unit) and electricity duty. Enter the FPPAS rate and duty percentage from your bill in this calculator to see the full amount.

Are the slabs different on a two-month bill?

The GERC tariff is on a monthly basis and the company adjusts it for the billing period. On a two-month bill the slabs are doubled – for example the cheapest rate applies to the first 100 units instead of 50. Choose "2 months" in the calculator for this.

What is the BPL electricity rate in Gujarat?

BPL households pay ₹1.50 per unit for the first 50 units a month and a fixed charge of ₹5 a month. Units above 50 are charged at normal residential rates. A copy of the BPL card has to be given at the company's office.

Is the rural tariff different from the city tariff?

Yes. Homes in gram panchayat areas served by the state companies come under RGP (Rural), which is 30–40 paise per unit cheaper in each slab. The fixed charges are the same.

Sources

Results are estimates based on general rules in Gujarat, for information only. They are not legally binding.

Other tools